The project included:
Changing the ceiling system, including changing the levels, changing the air conditioning system and the filtration system, upgrading the supply system and adding process piping.
Making changes to the electrical system, installations, replacing the floor.
Upgrading a chemical fume hood and preparing suction for chemical systems.
Our challenge:
Work in a small area, in an activity building, without the possibility of deviating from the work area while handling all the required disciplines in a short time.
In the pictures:
The process of building the clean room and preparing for the absorption of the device.
Including making all the necessary preparations for the clean room, until the day before inserting the device into the room (which does not yet appear in the photos).