The project included:
Designing and setting up chemical analysis laboratories with many chemical hoods and air inflow and outflow installations in a multipurpose building in the Ness Ziona Science Park.
Our challenges were:
Effective exploitation, according to the standards, of fresh air from outside the labs into the chemical hoods while removing large quantities of air from the labs to outside the building. Effective, comfortable and safe working by offering a wide range of different supply lines to a large number of peripheral points in the safety hoods/cabinets as well as on the work benches.