The project included:
Designing and setting up the production installation in clean rooms to B, C & D grade levels of cleanliness, R&D labs, quality control labs, storerooms, cold rooms, freezer rooms, designing and setting up the offices. The above clean production hall (clean rooms) with a walking ceiling was designed allowing the current operation of the rooms. A lower technical space was created beneath the floor of the ground floor, for service and maintenance.
In the photographs:
In the vicinity of the clean rooms / production halls
The photographs show pharmaceutical rooms constructed of an aluminum frame clad with HPL. Walking ceilings, integral fridges and freezers adapted for clean rooms. The clean room furniture was constructed from stainless steel pipes with an electro-polish finish with Trespa Top Lab work surfaces to a thickness of 20 mm. The processing equipment is at the final stages of assembly, operations commencement and pre-validation calibrations.